15 February 2009

Finishing Works

Report No. 11: Estimation on Finishing Works
by: Barbas, R.; Ebuña, R.; Gironella, F.; Young, J.
14 Feb 09, 09:30-11:00 AM at E 203, Eng'g Bldg, XU



These are copies of the Powerpoint presentations in .pps:
Please check for more updates, e.g. references, corrections, additions.

04 February 2009

Vane Shear Test

Report No. 5: Vane Shear Test
by: Angeles, L.; Aquino, J.; Colanse, C.; Gironella, F.; Young, J.
03 Feb 09, 06:30-07:00 PM at E 205, Eng'g Bldg, XU



Downloadable handout is now available: Vane Shear Test HANDOUT
Please check for more corrections and updates.

Other files:
This is a copy of the Powerpoint presentation in .pps: Vane Shear Test POWERPOINT


References and Additional Readings:

29 January 2009

Topographic Surveying

This is our contour map of XU Soccer Field (from goal post in front of ICC to goal post in front of Eng'g Bldg.). Surveying by open traverse was used (since the area is small), with the vertical circle set to 0 degrees. Point A was assumed to have a 1.000 meters elevation.

AutoCAD was used in the map-making. Index contour lines were set to 0.05 meters.

Downloadable Data Sheet (use Export option): Topographic Survey of XU Soccer Field Data

The data sheet provided was the one we used in the field. It can calculate elevations instantly upon entering the data. Succeeding worksheets are used for interpolation during map making.

Stardew Valley: Year 1